Assessment Year | 1991 |
---|---|
Principal Product | CENTRAL VACUUM CLEANERS |
NAICS |
n/a
|
SIC | 3635: Household Vacuum Cleaners |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
n/a
|
Annual Production | 80,000
pieces
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,337 | 419,988 |
kWh
|
$0.060 |
Natural Gas | $17,607 | 3,925 |
MMBtu
|
$4.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $4,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,445 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $2,263 | $900 | - |
$2,263
-
MMBtu
|
|
02 | 2.7243: Improve air circulation with destratification fans / other methods | $464 | $448 |
$(-272.0)
(-4,396)
kWh
|
$736
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $248 | - |
$248
4,103
kWh
|
- | |
04 | 2.7314: Reduce ventilation air | $507 | $700 |
$82
1,465
kWh
|
$425
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $382 | $686 | - |
$382
-
MMBtu
|
|
06 | 2.7111: Reduce illumination to minimum necessary levels | $182 | $90 |
$182
2,931
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $95 | $20 |
$95
1,465
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $112 | $20 |
$112
1,758
kWh
|
- | |
09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $192 | $20 |
$192
3,224
kWh
|
- | |
TOTAL RECOMMENDED | $4,445 | $2,884 |
$639
10,550
kWh
|
$3,806
-
MMBtu
|
||
TOTAL IMPLEMENTED | $4,445 | $2,884 |
$639
10,550
kWh
|
$3,806
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs