ITAC Assessment: HO0230
ITAC logo
ITAC Assessment: HO0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Elevator Equipment
NAICS
n/a
SIC 3534: Elevators and Moving Stairways
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 49,000
ft2
Annual Production 4,200
pieces
Production Hrs. Annual 3,172
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,433 348,476
kWh
Electricity Demand $41,189 1,838
kW-mo/yr
Electricity Fees $5,792 -
Natural Gas $10,699 1,262
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $343,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,545 - - $15,545
-
kW-mo/yr
- -
02 2.4225: Install common header on compressors $1,541 $900 $1,541
24,033
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $459 $400 $198
3,224
kWh
$261
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $304 $60 $131
2,052
kWh
$173
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $6,783 - $6,783
45,428
kWh
- - -
06 2.4156: Establish a preventative maintenance program $22,230 $4,000 - - - $22,230
07 2.7447: Install vinyl strip / high speed / air curtain doors $5,190 $750 - - $5,190
-
MMBtu
-
08 4.424: Improve space comfort conditioning $1,440 $744 - - - $1,440
09 4.424: Improve space comfort conditioning $840 $270 - - - $840
10 4.513: Re-arrange equipment layout to reduce labor costs $3,900 $600 - - - $3,900
11 4.125: $5,000 $8,600 - - - $5,000
12 3.7223: Install shrouding on machines to prevent splashing $2,340 $2,000 - - - $2,340
13 4.651: Install back-up equipment $18,465 $7,000 - - - $18,465
14 4.111: Add equipment/ operators to reduce production bottleneck $127,605 $8,400 - - - $127,605
15 4.424: Improve space comfort conditioning $1,440 $800 - - - $1,440
16 4.611: Begin a practice of predictive / preventative maintenance $25,000 $1,300 - - - $25,000
17 4.611: Begin a practice of predictive / preventative maintenance $50,000 $2,300 - - - $50,000
18 4.322: Eliminate old stock and modify inventory control $540 $395 - - - $540
19 4.111: Add equipment/ operators to reduce production bottleneck $675 $475 - - - $675
20 4.625: Develop standard operating procedures $8,520 $8,000 - - - $8,520
21 4.652: Replace existing equipment with more suitable substitutes $24,000 $4,000 - - - $24,000
22 3.7121: Improve handling practices $1,950 $100 - - - $1,950
23 4.423: Move product using mechanical means $3,900 $5,000 - - - $3,900
24 3.5248: Separate and recycle scrap metal to foundry or for sale $15,600 $500 - - - $15,600
25 3.1192: Reduce scrap production $600 $5,000 - - - $600
TOTAL RECOMMENDED $343,867 $61,594 $8,653
74,737
kWh
$15,979
-
kW-mo/yr
$5,190
-
MMBtu
$314,045
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs