Assessment Year | 1998 |
---|---|
Principal Product | Travel trailers |
NAICS |
n/a
|
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 221 |
Plant Area |
80,000
ft2
|
Annual Production | 1,693
pieces
|
Production Hrs. Annual | 2,115
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,398 | 881,008 |
kWh
|
$0.064 |
Electricity Demand | $28,488 | 4,105 |
kW-mo/yr
|
$6.94 |
Electricity Fees | $202 | - |
|
- |
Fuel Oil #2 | $24,090 | 5,454 |
MMBtu
|
$4.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $66,272 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,527 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,110 | $35,934 |
$6,697
105,217
kWh
|
$4,413
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $652 | $500 |
$394
6,155
kWh
|
$258
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $920 | $20 |
$555
8,792
kWh
|
$365
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $455 | $60 |
$455
7,034
kWh
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,250 | $200 | - | - |
$1,250
-
MMBtu
|
- | - | |
06 | 2.7231: Use radiant heater for spot heating | $3,205 | $9,600 | - | - |
$3,205
-
MMBtu
|
- | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $774 | $750 | - | - |
$774
-
MMBtu
|
- | - | |
08 | 4.441: Install automatic packing equipment | $4,800 | $5,200 | - | - | - |
$4,800
-
lb
|
- | |
09 | 4.513: Re-arrange equipment layout to reduce labor costs | $611 | $500 | - | - | - | - | $611 | |
10 | 4.513: Re-arrange equipment layout to reduce labor costs | $15,000 | $1,040 | - | - | - | - | $15,000 | |
11 | 4.513: Re-arrange equipment layout to reduce labor costs | $24,440 | $500 | - | - | - | - | $24,440 | |
12 | 4.513: Re-arrange equipment layout to reduce labor costs | $3,055 | $2,500 | - | - | - | - | $3,055 | |
TOTAL RECOMMENDED | $66,272 | $56,804 |
$8,101
127,198
kWh
|
$5,036
-
kW-mo/yr
|
$5,229
-
MMBtu
|
$4,800
-
lb
|
$43,106 | ||
TOTAL IMPLEMENTED | $22,527 | $52,564 |
$8,101
127,198
kWh
|
$5,036
-
kW-mo/yr
|
$3,979
-
MMBtu
|
$4,800
-
lb
|
$611 | ||