ITAC Assessment: HO0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Travel trailers
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 221
Plant Area 80,000
ft2
Annual Production 1,693
pieces
Production Hrs. Annual 2,115
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,398 881,008
kWh
Electricity Demand $28,488 4,105
kW-mo/yr
Electricity Fees $202 -
Fuel Oil #2 $24,090 5,454
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,272 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,110 $35,934 $6,697
105,217
kWh
$4,413
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $652 $500 $394
6,155
kWh
$258
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $920 $20 $555
8,792
kWh
$365
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $455 $60 $455
7,034
kWh
- - - -
05 2.2437: Recover waste heat from equipment $1,250 $200 - - $1,250
-
MMBtu
- -
06 2.7231: Use radiant heater for spot heating $3,205 $9,600 - - $3,205
-
MMBtu
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $774 $750 - - $774
-
MMBtu
- -
08 4.441: Install automatic packing equipment $4,800 $5,200 - - - $4,800
-
lb
-
09 4.513: Re-arrange equipment layout to reduce labor costs $611 $500 - - - - $611
10 4.513: Re-arrange equipment layout to reduce labor costs $15,000 $1,040 - - - - $15,000
11 4.513: Re-arrange equipment layout to reduce labor costs $24,440 $500 - - - - $24,440
12 4.513: Re-arrange equipment layout to reduce labor costs $3,055 $2,500 - - - - $3,055
TOTAL RECOMMENDED $66,272 $56,804 $8,101
127,198
kWh
$5,036
-
kW-mo/yr
$5,229
-
MMBtu
$4,800
-
lb
$43,106
TOTAL IMPLEMENTED $22,527 $52,564 $8,101
127,198
kWh
$5,036
-
kW-mo/yr
$3,979
-
MMBtu
$4,800
-
lb
$611
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs