ITAC Assessment: HO0054
ITAC logo
ITAC Assessment: HO0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Push Pin
NAICS
n/a
SIC 3965: Fasteners, Buttons, Needles, and Pins
Sales Range $1
M
to 5
M
# of Employees 37
Plant Area 52,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,431 386,870
kWh
Natural Gas $17,943 2,961
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,431 $2,675 $2,431
16,706
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $511 $1,626 $511
3,517
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $2,200 $2,400 $2,200
15,826
kWh
-
04 2.4133: Use most efficient type of electric motors $278 $568 $278
2,052
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $466 $300 $466
3,224
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $226 $305 - $226
-
MMBtu
07 2.7124: Make a practice of turning off lights when not needed $543 - $543
3,517
kWh
-
TOTAL RECOMMENDED $6,655 $7,874 $6,429
44,842
kWh
$226
-
MMBtu
TOTAL IMPLEMENTED $5,886 $7,569 $5,886
41,325
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs