ITAC Assessment: HO0037
ITAC logo
ITAC Assessment: HO0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Plastic Bags
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 80,000
ft2
Annual Production 18,000
ton
Production Hrs. Annual 8,500
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,038,232 11,582,063
kWh
Fuel Oil #2 $28,400 5,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,969 $155 $1,969
21,981
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,247 $141 $1,247
14,068
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,496 $5,188 $9,496
105,510
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,177 $800 $1,177
13,189
kWh
-
05 2.4133: Use most efficient type of electric motors $4,303 $2,218 $4,303
77,081
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $19,005 $1,050 $19,005
211,313
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,188 $1,200 - $2,188
-
MMBtu
08 2.4231: Reduce the pressure of compressed air to the minimum required $180 - $180
2,052
kWh
-
09 2.6231: Utilize controls to operate equipment only when needed $26,898 $1,000 $26,898
300,117
kWh
-
TOTAL RECOMMENDED $66,463 $11,752 $64,275
745,311
kWh
$2,188
-
MMBtu
TOTAL IMPLEMENTED $36,605 $4,714 $34,417
413,247
kWh
$2,188
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs