ITAC Assessment: AM0445
ITAC logo
ITAC Assessment: AM0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Food processing and battery handling equipment
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 92,000
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 2,328
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,508 1,209,162
kWh
Electricity Demand $10,505 5,412
kW-mo/yr
Electricity Fees $17,551 -
Natural Gas $51,184 9,080
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,490 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,800 - $5,800
123,300
kWh
- - -
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,390 - $2,390
50,800
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,390 $500 $1,390
29,600
kWh
- - -
04 2.7121: Utilize daylight whenever possible in lieu of artificial light $430 - $430
9,230
kWh
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $380 $15 $260
5,600
kWh
$120
-
kW-mo/yr
- -
06 3.7132: Reuse rags until completely soiled $1,400 - - - - $1,400
07 2.7142: Utilize higher efficiency lamps and/or ballasts $700 $380 $120
2,630
kWh
$10
-
kW-mo/yr
$570 -
TOTAL RECOMMENDED $12,490 $895 $10,390
221,160
kWh
$130
-
kW-mo/yr
$570 $1,400
TOTAL IMPLEMENTED $10,710 $880 $10,130
215,560
kWh
$10
-
kW-mo/yr
$570 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings