Assessment Year | 2003 |
---|---|
Principal Product | Food processing and battery handling equipment |
NAICS | 333241: Food Product Machinery Manufacturing |
SIC | 3556: Food Products Machinery |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
92,000
ft2
|
Annual Production | 1,200,000
lb
|
Production Hrs. Annual | 2,328
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $56,508 | 1,209,162 |
kWh
|
$0.047 |
Electricity Demand | $10,505 | 5,412 |
kW-mo/yr
|
$1.94 |
Electricity Fees | $17,551 | - |
|
- |
Natural Gas | $51,184 | 9,080 |
MMBtu
|
$5.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,710 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $5,800 | - |
$5,800
123,300
kWh
|
- | - | - | |
02 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,390 | - |
$2,390
50,800
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,390 | $500 |
$1,390
29,600
kWh
|
- | - | - | |
04 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $430 | - |
$430
9,230
kWh
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $380 | $15 |
$260
5,600
kWh
|
$120
-
kW-mo/yr
|
- | - | |
06 | 3.7132: Reuse rags until completely soiled | $1,400 | - | - | - | - | $1,400 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $700 | $380 |
$120
2,630
kWh
|
$10
-
kW-mo/yr
|
$570 | - | |
TOTAL RECOMMENDED | $12,490 | $895 |
$10,390
221,160
kWh
|
$130
-
kW-mo/yr
|
$570 | $1,400 | ||
TOTAL IMPLEMENTED | $10,710 | $880 |
$10,130
215,560
kWh
|
$10
-
kW-mo/yr
|
$570 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs