ITAC Assessment: HO0003
ITAC logo
ITAC Assessment: HO0003
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product VOICE RESPONSE COMPUTERS
NAICS
n/a
SIC 3661: Telephone and Telegraph Apparatus
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,600
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,141 1,890,094
kWh
Natural Gas $4,301 747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,912 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,912

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $3,943 $2,140 $3,943
34,584
kWh
-
02 2.6232: Install set-back timers $334 $408 $334
2,931
kWh
-
03 2.7226: Use computer programs to optimize hvac performance $10,979 $10,470 $10,979
284,291
kWh
-
04 2.7422: Plant trees or shrubs near windows to shield from sunlight $2,140 $3,036 $2,140
18,757
kWh
-
05 2.7261: Install timers and/or thermostats $6,280 - $6,280
55,100
kWh
-
06 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $779 - $779
6,741
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $457 $1,500 $593
5,275
kWh
$(-136.0)
-
MMBtu
TOTAL RECOMMENDED $24,912 $17,554 $25,048
407,679
kWh
$(-136.0)
-
MMBtu
TOTAL IMPLEMENTED $24,912 $17,554 $25,048
407,679
kWh
$(-136.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs