ITAC Assessment: UD0323
ITAC logo
ITAC Assessment: UD0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product REFRIGERATORS,ICE MAKERS
NAICS
n/a
SIC 3632: Household Refrigerators and HOme and Farm Freezers
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 17,500
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,938 1,359,906
kWh
Natural Gas $19,871 3,941
MMBtu
LPG $8,714 1,282
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,566 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,979

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
01 2.1332: Convert combustion equipment to burn natural gas $2,239 - - $(-6,475.0)
-
MMBtu
$8,714
-
MMBtu
-
02 2.8114: Change rate schedules or other changes in utility service $7,073 $300 - $7,073
-
MMBtu
- -
03 3.4115: Recover and reuse cooling water $1,984 $300 - - - $1,984
04 2.2437: Recover waste heat from equipment $1,470 $3,000 - $1,470
-
MMBtu
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,821 $23,000 $16,861
322,978
kWh
$(-5,040.0)
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $9,979 $16,000 $11,007
210,727
kWh
$(-1,028.0)
-
MMBtu
- -
TOTAL RECOMMENDED $34,566 $42,600 $27,868
533,705
kWh
$(-4,000.0)
-
MMBtu
$8,714
-
MMBtu
$1,984
TOTAL IMPLEMENTED $9,979 $16,000 $11,007
210,727
kWh
$(-1,028.0)
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs