ITAC Assessment: GT0939
ITAC logo
ITAC Assessment: GT0939
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Micro Catheters
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $50
M
to 100
M
# of Employees 385
Plant Area 45,000
ft2
Annual Production 31,995,012
ton
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,325 5,302,470
kWh
TOTAL YEARLY COSTS $376,325
RECOMMENDED SAVINGS* $206,200 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,801

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Ancillary Material Cost Savings
01 2.4323: Use optimum size and capacity equipment $10,466 $500 - - $10,466
02 2.8121: Apply for tax-free status for energy purchases $17,391 $2,000 - $17,391 -
03 2.4226: Use / purchase optimum sized compressor $165,933 $33,069 - - $165,933
04 2.7142: Utilize higher efficiency lamps and/or ballasts $11,758 $8,593 $11,758
165,699
kWh
- -
05 2.7261: Install timers and/or thermostats $652 $563 $652
9,185
kWh
- -
TOTAL RECOMMENDED $206,200 $44,725 $12,410
174,884
kWh
$17,391 $176,399
TOTAL IMPLEMENTED $29,801 $11,156 $12,410
174,884
kWh
$17,391 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs