Assessment Year | 2011 |
---|---|
Principal Product | Aircraft and Aircraft Parts |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
227,000
ft2
|
Annual Production | 26
pieces
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $265,252 | 2,522,571 |
kWh
|
$0.11 |
Natural Gas | $39,182 | 3,770 |
MMBtu
|
$10.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $84,741 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,962 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,620 | $15,500 |
$8,620
89,000
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,731 | - |
$1,731
17,882
kWh
|
- | - | |
03 | 2.4225: Install common header on compressors | $2,800 | $3,200 |
$2,800
29,000
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,921 | $21,722 |
$11,921
123,141
kWh
|
- | - | |
05 | 2.7122: Disconnect ballasts | $588 | - |
$588
6,072
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,188 | $38,276 |
$6,188
63,922
kWh
|
- | - | |
07 | 2.2314: Replace heat treating oven with more efficient unit | $38,551 | $150,000 |
$7,320
75,600
kWh
|
- |
$31,231
-
MMBtu
|
|
08 | 2.8112: Combine utility meters | $14,342 | $10,000 | - | $14,342 | - | |
TOTAL RECOMMENDED | $84,741 | $238,698 |
$39,168
404,618
kWh
|
$14,342 |
$31,231
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,962 | $25,500 |
$8,620
89,000
kWh
|
$14,342 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs