ITAC Assessment: UM0202
ITAC logo
ITAC Assessment: UM0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Non-metallic enclosures
NAICS
n/a
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 96,920
ft2
Annual Production 2,100,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,848 3,007,358
kWh
Electricity Demand $59,040 6,276
kW-mo/yr
Electricity Fees $1,701 -
Natural Gas $24,666 5,199
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,861

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,238 $10,640 n/a $2,163
59,772
kWh
$1,075
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $100 $1,150 $100
32,230
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,069 $1,000 $711
19,924
kWh
$358
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,487 $450 $988
27,835
kWh
$499
-
kW-mo/yr
- -
05 2.2511: Insulate bare equipment $10,288 $1,195 $10,288
183,711
kWh
- - -
06 2.2136: Install / repair insulation on steam lines $737 $1,145 - - - $737
-
MMBtu
07 2.3212: Optimize plant power factor $1,180 $2,590 - - $1,180 -
TOTAL RECOMMENDED $18,099 $18,170 $14,250
323,472
kWh
$1,932
-
kW-mo/yr
$1,180 $737
-
MMBtu
TOTAL IMPLEMENTED $14,861 $7,530 $12,087
263,700
kWh
$857
-
kW-mo/yr
$1,180 $737
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs