ITAC Assessment: GT0872
ITAC logo
ITAC Assessment: GT0872
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Prepared Frozen Foods
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area 20,800
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $293,202 6,448,615
kWh
Electricity Demand $189,307 13,920
kW-mo/yr
Natural Gas $115,317 18,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,739 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,873

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $960 $1,300 $960
20,135
kWh
- -
02 2.4314: Use synthetic lubricant $9,230 - $9,230
193,920
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,954 $19,633 $2,628
49,410
kWh
$2,326
-
kW-mo/yr
-
04 2.4322: Use or replace with energy efficient substitutes $487 $150,000 $487
10,230
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $9,328 $20,000 $6,510
121,660
kWh
$2,818
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $26,710 $73,600 $26,710
561,139
kWh
- -
07 2.6231: Utilize controls to operate equipment only when needed $12,202 $20,000 $8,510
159,030
kWh
$3,692
-
kW-mo/yr
-
08 2.5113: Use direct flame impingement or infrared processing for chamber type heating $63,868 $350,000 - - $63,868
-
MMBtu
TOTAL RECOMMENDED $127,739 $634,533 $55,035
1,115,524
kWh
$8,836
-
kW-mo/yr
$63,868
-
MMBtu
TOTAL IMPLEMENTED $83,873 $521,300 $17,187
345,945
kWh
$2,818
-
kW-mo/yr
$63,868
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs