ITAC Assessment: GT0812
ITAC logo
ITAC Assessment: GT0812
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Dental Drill Bits
NAICS 339114: Dental Equipment and Supplies Manufacturing
SIC 3843: Dental Equipment and Supplies
Sales Range $5
M
to 10
M
# of Employees 420
Plant Area 85,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,750 3,530,445
kWh
Electricity Demand $80,859 7,990
kW-mo/yr
Electricity Fees $20,843 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,171

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.4314: Use synthetic lubricant $600 - $406
9,512
kWh
$194
-
kW-mo/yr
- -
02 2.7261: Install timers and/or thermostats $20,280 $10,000 $20,280
609,120
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $469 $400 $340
7,920
kWh
$129
-
kW-mo/yr
- -
04 2.2628: Utilize a less expensive cooling method $283 $300 $192
4,500
kWh
$91
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $195 $221 $100
2,340
kWh
$95
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,096 $24,867 $9,505
222,591
kWh
$4,591
-
kW-mo/yr
- -
07 2.8112: Combine utility meters $3,889 $4,550 - - - $3,889
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,393 $3,500 $945
22,125
kWh
$448
-
kW-mo/yr
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,363 $8,720 $1,297
6,815
kWh
- $2,066 -
TOTAL RECOMMENDED $44,568 $52,558 $33,065
884,923
kWh
$5,548
-
kW-mo/yr
$2,066 $3,889
TOTAL IMPLEMENTED $35,171 $35,088 $30,291
843,563
kWh
$4,880
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs