ITAC Assessment: GT0790
ITAC logo
ITAC Assessment: GT0790
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product SULFURIC ACID
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 200,000
ft2
Annual Production 300,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $572,801 16,558,451
kWh
Natural Gas $222 1
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $94,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,781

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $160 $300 $160
4,690
kWh
- - - -
02 4.231: Purchase equipment instead of leasing $3,294 $21,890 - - - $3,294 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $809 $1,970 $809
21,100
kWh
- - - -
04 2.7224: Reduce space conditioning during non-working hours $130 $200 $90
2,760
kWh
$40
-
MMBtu
- - -
05 2.2511: Insulate bare equipment $2,365 $3,895 - - $2,365
-
MMBtu
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $83,000 $300,000 $83,000
2,370,000
kWh
- - - -
07 2.8114: Change rate schedules or other changes in utility service $4,972 - - - - - $4,972
TOTAL RECOMMENDED $94,730 $328,255 $84,059
2,398,550
kWh
$40
-
MMBtu
$2,365
-
MMBtu
$3,294 $4,972
TOTAL IMPLEMENTED $5,781 $1,970 $809
21,100
kWh
- - - $4,972
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs