Assessment Year | 2004 |
---|---|
Principal Product | SULFURIC ACID |
NAICS | 325180: Other Basic Inorganic Chemical Manufacturing |
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 20 |
Plant Area |
200,000
ft2
|
Annual Production | 300,000
ton
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $572,801 | 16,558,451 |
kWh
|
$0.035 |
Natural Gas | $222 | 1 |
MMBtu
|
$222.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $94,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,781 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $160 | $300 |
$160
4,690
kWh
|
- | - | - | - | |
02 | 4.231: Purchase equipment instead of leasing | $3,294 | $21,890 | - | - | - | $3,294 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $809 | $1,970 |
$809
21,100
kWh
|
- | - | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $130 | $200 |
$90
2,760
kWh
|
$40
-
MMBtu
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $2,365 | $3,895 | - | - |
$2,365
-
MMBtu
|
- | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $83,000 | $300,000 |
$83,000
2,370,000
kWh
|
- | - | - | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $4,972 | - | - | - | - | - | $4,972 | |
TOTAL RECOMMENDED | $94,730 | $328,255 |
$84,059
2,398,550
kWh
|
$40
-
MMBtu
|
$2,365
-
MMBtu
|
$3,294 | $4,972 | ||
TOTAL IMPLEMENTED | $5,781 | $1,970 |
$809
21,100
kWh
|
- | - | - | $4,972 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Other Energy Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs