ITAC Assessment: GT0464
ITAC logo
ITAC Assessment: GT0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product CAKES AND DESSERTS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area
n/a
Annual Production 1,100,000
pieces
Production Hrs. Annual 5,300
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,162 1,039,273
kWh
Natural Gas $38,374 6,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,631 $10,600 $1,781
26,084
kWh
- $(-150.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,670 $6,000 $1,670
25,205
kWh
- -
03 2.6232: Install set-back timers $247 $375 $247
3,517
kWh
- -
04 2.7446: Utilize sensors controlling roof and wall openings $256 $300 $256
3,810
kWh
- -
05 2.1224: Replace boiler $8,120 $18,000 - $8,120
-
MMBtu
-
06 2.3191: Use demand controller or load shedder $13,680 $23,500 $13,680
-
kWh
- -
TOTAL RECOMMENDED $25,604 $58,775 $17,634
58,616
kWh
$8,120
-
MMBtu
$(-150.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs