Assessment Year | 1992 |
---|---|
Principal Product | METAL FURNITURE |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
n/a
|
Annual Production | 11,000,000
lb
|
Production Hrs. Annual | 1,960
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $54,521 | 691,970 |
kWh
|
$0.079 |
Natural Gas | $22,607 | 4,117 |
MMBtu
|
$5.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,377 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,507 | $6,820 |
$1,679
21,395
kWh
|
- | $(-172.0) | |
02 | 2.6232: Install set-back timers | $1,450 | - |
$1,450
18,464
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,340 | $800 |
$1,340
16,999
kWh
|
- | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $11,540 | - |
$25,546
311,547
kWh
|
$(-14,006.0)
-
MMBtu
|
- | |
05 | 2.7261: Install timers and/or thermostats | $5,540 | $3,900 | - |
$5,540
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $21,377 | $11,520 |
$30,015
368,405
kWh
|
$(-8,466.0)
-
MMBtu
|
$(-172.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs