ITAC Assessment: AM0706
ITAC logo
ITAC Assessment: AM0706
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Plastic food containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 80,000
ft2
Annual Production 25,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,659 3,714,640
kWh
Electricity Demand $47,988 6,471
kW-mo/yr
Electricity Fees $3,400 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,573

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,870 $20 $7,880
143,280
kWh
$1,990
-
kW-mo/yr
-
02 2.6218: Turn off equipment when not in use $8,000 - $8,000
145,700
kWh
- -
03 2.3212: Optimize plant power factor $5,687 $19,900 - $5,687
-
kW-mo/yr
-
04 2.9131: Install hydrogen fuel cell $3,180 - $1,010
18,360
kWh
- $2,170
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,425 $1,350 $1,425
25,900
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $940 $200 $750
13,660
kWh
$190
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $586 $200 $130
2,505
kWh
$18
-
kW-mo/yr
$438
08 2.7135: Install occupancy sensors $65 $60 $65
1,230
kWh
- -
TOTAL RECOMMENDED $29,753 $21,730 $19,260
350,635
kWh
$7,885
-
kW-mo/yr
$2,608
TOTAL IMPLEMENTED $18,573 $21,730 $10,250
186,575
kWh
$7,885
-
kW-mo/yr
$438
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs