ITAC Assessment: GT0442
ITAC logo
ITAC Assessment: GT0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED CARDBOARD
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 714,000
thousand feet
Production Hrs. Annual 6,120
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,878 3,924,092
kWh
Natural Gas $166,977 55,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,219 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,000 $12,800 $5,000
87,925
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $440 $180 $440
6,448
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,430 - - $2,880
-
MMBtu
$(-450.0)
04 2.4133: Use most efficient type of electric motors $813 $497 $813
12,309
kWh
- -
05 2.2121: Increase amount of condensate returned $5,310 $3,750 - $5,310
-
MMBtu
-
06 2.6232: Install set-back timers $1,650 - $1,650
24,912
kWh
- -
07 2.7226: Use computer programs to optimize hvac performance $3,576 $2,350 $3,064
46,014
kWh
$512
-
MMBtu
-
TOTAL RECOMMENDED $19,219 $19,577 $10,967
177,608
kWh
$8,702
-
MMBtu
$(-450.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs