| Assessment Year | 1991 |
|---|---|
| Principal Product | BUILDING MARBLE |
| NAICS |
n/a
|
| SIC | 3281: Cut Stone and Stone Products |
| Sales Range | $5 M to 10M |
| # of Employees | 72 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,040
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $220,399 | 2,584,115 |
kWh
|
$0.085 |
| Natural Gas | $49,838 | 8,435 |
MMBtu
|
$5.91 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $52,772 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $43,650 | - |
$43,650
-
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $44 | - |
$140
2,052
kWh
|
- | $(-96.0) | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,488 | $5,487 |
$1,488
21,688
kWh
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $387 | $4,645 |
$387
2,931
kWh
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,085 | - |
$1,085
15,826
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $260 | $300 |
$260
3,810
kWh
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,970 | $2,400 |
$3,970
57,737
kWh
|
- | - | |
| 08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,238 | - | - |
$738
-
MMBtu
|
$500 | |
| 09 | 2.2136: Install / repair insulation on steam lines | $310 | $119 | - |
$310
-
MMBtu
|
- | |
| 10 | 2.7261: Install timers and/or thermostats | $340 | $100 | - |
$340
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $52,772 | $13,051 |
$50,980
104,044
kWh
|
$1,388
-
MMBtu
|
$404 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs