ITAC Assessment: GT0418
ITAC logo
ITAC Assessment: GT0418
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product FARM EQUIPMENT
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 1,392
ton
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $156,094 1,573,271
kWh
Natural Gas $104,727 18,841
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,956 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,005

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8114: Change rate schedules or other changes in utility service $31,780 - $31,780
-
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,056 $666 $1,056
13,189
kWh
-
03 2.6232: Install set-back timers $178 - $178
2,345
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $8,850 $5,500 - $8,850
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $16,381 $132,430 - $16,381
-
MMBtu
06 2.1122: Re-size charging openings or add a movable door on equipment $790 $770 - $790
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $921 $1,430 $921
11,430
kWh
-
TOTAL RECOMMENDED $59,956 $140,796 $33,935
26,964
kWh
$26,021
-
MMBtu
TOTAL IMPLEMENTED $11,005 $7,596 $2,155
26,964
kWh
$8,850
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs