ITAC Assessment: CO0395
ITAC logo
ITAC Assessment: CO0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product beer
NAICS
n/a
SIC 2082: Malt Beverages
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 27,800
ft2
Annual Production 2,560,000
Tgal
Production Hrs. Annual 4,992
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,022 983,001
kWh
Electricity Demand $24,726 2,912
kW-mo/yr
Electricity Fees $120 -
Natural Gas $44,126 12,997
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,990 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Gaseous Waste Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $920 $(-3,940.0) $540
18,757
kWh
$380
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $630 $930 $370
12,896
kWh
$260
-
kW-mo/yr
- -
03 3.5311: Recover and reuse waste material $56,440 $245,000 $(-6,420.0)
(-225,381)
kWh
$(-2,650.0)
-
kW-mo/yr
$(-10.0)
-
MMBtu
$65,520
-
lb
TOTAL RECOMMENDED $57,990 $241,990 $(-5,510.0)
(-193,728)
kWh
$(-2,010.0)
-
kW-mo/yr
$(-10.0)
-
MMBtu
$65,520
-
lb
TOTAL IMPLEMENTED $1,550 $(-3,010.0) $910
31,653
kWh
$640
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs