Assessment Year | 1989 |
---|---|
Principal Product | MOTOR CONTROLS |
NAICS |
n/a
|
SIC | 3625: Relays and Industrial Controls |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
n/a
|
Annual Production | 7,280
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,096 | 1,769,930 |
kWh
|
$0.079 |
Natural Gas | $5,755 | 1,021 |
MMBtu
|
$5.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,498 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $7,220 | $18,000 |
$6,550
240,621
kWh
|
$670
-
MMBtu
|
|
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $542 | - |
$542
7,034
kWh
|
- | |
03 | 2.4133: Use most efficient type of electric motors | $336 | $183 |
$336
4,396
kWh
|
- | |
04 | 2.7123: Keep lamps and reflectors clean | $3,750 | $14,410 |
$3,750
47,773
kWh
|
- | |
05 | 2.6232: Install set-back timers | $370 | - |
$370
4,689
kWh
|
- | |
06 | 2.8114: Change rate schedules or other changes in utility service | $4,550 | - |
$4,550
-
kWh
|
- | |
07 | 2.7245: Use direct air supply to exhaust hoods | $3,560 | $4,000 |
$1,910
24,326
kWh
|
$1,650
-
MMBtu
|
|
08 | 2.7231: Use radiant heater for spot heating | $3,840 | $19,500 |
$2,940
107,855
kWh
|
$900
-
MMBtu
|
|
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,600 | $29,600 |
$4,600
169,109
kWh
|
- | |
TOTAL RECOMMENDED | $28,768 | $85,693 |
$25,548
605,803
kWh
|
$3,220
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,498 | $41,683 |
$12,278
384,232
kWh
|
$3,220
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs