ITAC Assessment: GT0378
ITAC logo
ITAC Assessment: GT0378
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PROCESSED MEATS
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 2,800,000
lb
Production Hrs. Annual 4,680
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,597 1,596,131
kWh
Natural Gas $48,639 9,302
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,508 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,508

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $270 $722 $270
3,810
kWh
-
02 2.6232: Install set-back timers $800 $160 $800
11,430
kWh
-
03 2.3191: Use demand controller or load shedder $6,940 $9,000 $6,940
51,876
kWh
-
04 2.7446: Utilize sensors controlling roof and wall openings $65 $40 $65
879
kWh
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $250 $300 - $250
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,183 $1,725 $3,183
46,014
kWh
-
TOTAL RECOMMENDED $11,508 $11,947 $11,258
114,009
kWh
$250
-
MMBtu
TOTAL IMPLEMENTED $11,508 $11,947 $11,258
114,009
kWh
$250
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs