Assessment Year | 1988 |
---|---|
Principal Product | CUSTOM DYEING & FINISH |
NAICS |
n/a
|
SIC | 2261: Finishers of Broadwoven Fabrics of Cotton |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
n/a
|
Annual Production | 75,000
thousand feet
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,764 | 8,080,012 |
kWh
|
$0.045 |
Natural Gas | $665,452 | 194,920 |
MMBtu
|
$3.41 |
LPG | $2,821 | 672 |
MMBtu
|
$4.20 |
Fuel Oil #2 | $5,380 | 1,224 |
MMBtu
|
$4.40 |
Fuel Oil #6 | $5,793 | 2,120 |
MMBtu
|
$2.73 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,680 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $30,000 | $6,670 | - |
$30,000
-
MMBtu
|
|
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $15,600 | $500 | - |
$15,600
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,620 | $17,560 |
$11,620
259,965
kWh
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $420 | $1,030 |
$420
9,379
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $800 | $1,320 | - |
$800
-
MMBtu
|
|
06 | 2.2135: Repair and eliminate steam leaks | $5,280 | $4,075 | - |
$5,280
-
MMBtu
|
|
07 | 2.2511: Insulate bare equipment | $10,930 | $8,220 | - |
$10,930
-
MMBtu
|
|
TOTAL RECOMMENDED | $74,650 | $39,375 |
$12,040
269,344
kWh
|
$62,610
-
MMBtu
|
||
TOTAL IMPLEMENTED | $51,680 | $12,565 | - |
$51,680
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs