ITAC Assessment: GT0327
ITAC logo
ITAC Assessment: GT0327
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product AUTO BRAKE & WHEEL CYLINDERS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 315
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 4,275
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $501,095 9,322,099
kWh
Natural Gas $44,766 10,355
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,731 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,841

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6232: Install set-back timers $180 $100 $180
3,224
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $32,320 $25,000 $32,320
956,331
kWh
-
03 2.4133: Use most efficient type of electric motors $1,115 $812 $1,115
20,516
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $13,406 $3,500 - $13,406
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $18,690 $4,300 $18,690
346,131
kWh
-
06 2.7251: Reduce air conditioning load by evaporating water from roof $15,020 $54,424 $15,020
187,866
kWh
-
TOTAL RECOMMENDED $80,731 $88,136 $67,325
1,514,068
kWh
$13,406
-
MMBtu
TOTAL IMPLEMENTED $46,841 $29,312 $33,435
976,847
kWh
$13,406
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs