Assessment Year | 2013 |
---|---|
Principal Product | Cocoa Products |
NAICS | 311351: Chocolate and Confectionery Manufacturing from Cacao Beans |
SIC | 2066: Chocolate and Cocoa Products |
Sales Range | greater than $500 M |
# of Employees | 50 |
Plant Area |
150,000
ft2
|
Annual Production | 9,999,999,999
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Delaware |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,608 | 1,175,079 |
kWh
|
$0.11 |
Natural Gas | $171,009 | 17,919 |
MMBtu
|
$9.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $100,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2153: Close off unneeded steam lines | $5,097 | $225 | - | $5,097 | - | |
02 | 2.2515: Use optimum thickness insulation | $7,200 | $432 | - | - |
$7,200
-
MMBtu
|
|
03 | 2.2437: Recover waste heat from equipment | $51,000 | $130,000 | - | - |
$51,000
-
MMBtu
|
|
04 | 2.1224: Replace boiler | $16,867 | $28,062 | - | - |
$16,867
-
MMBtu
|
|
05 | 2.2136: Install / repair insulation on steam lines | $1,900 | $3,500 | - | - |
$1,900
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,700 | $19,110 |
$5,700
51,000
kWh
|
- | - | |
07 | 2.4131: Size electric motors for peak operating efficiency | $7,100 | $22,500 |
$7,100
63,100
kWh
|
- | - | |
08 | 2.6218: Turn off equipment when not in use | $5,800 | - |
$5,800
51,800
kWh
|
- | - | |
TOTAL RECOMMENDED | $100,664 | $203,829 |
$18,600
165,900
kWh
|
$5,097 |
$76,967
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs