Assessment Year | 1996 |
---|---|
Principal Product | Fiberglass Piping |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
40,000
ft2
|
Annual Production | 6
pieces
|
Production Hrs. Annual | 0
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $300,165 | 12,125,440 |
kWh
|
$0.025 |
Electricity Demand | $379,036 | 21,550 |
kW-mo/yr
|
$17.59 |
Natural Gas | $174,861 | 71,791 |
MMBtu
|
$2.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $137,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $102,241 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,069 | $290 |
$4,752
176,143
kWh
|
$4,317
-
kW-mo/yr
|
- | - | - | |
02 | 2.2135: Repair and eliminate steam leaks | $12,966 | $140 | - | - |
$12,966
-
MMBtu
|
- | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,178 | $1,000 | - | - |
$5,178
-
MMBtu
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $6,524 | $160 |
$3,418
126,612
kWh
|
$3,106
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,185 | $1,006 |
$1,345
49,824
kWh
|
$1,840
-
kW-mo/yr
|
- | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $11,962 | $2,958 |
$5,954
220,692
kWh
|
$6,008
-
kW-mo/yr
|
- | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $1,175 | $1,008 |
$552
20,516
kWh
|
$623
-
kW-mo/yr
|
- | - | - | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $23,443 | $1,390 |
$10,813
400,645
kWh
|
$15,965
-
kW-mo/yr
|
$(-3,335.0)
-
MMBtu
|
- | - | |
09 | 3.7311: Maintain machines to reduce leaks | $1,314 | $900 | - | - | - |
$1,314
-
gal
|
- | |
10 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $62,830 | $8,000 | - | - | - | - |
$62,830
-
lb
|
|
TOTAL RECOMMENDED | $137,646 | $16,852 |
$26,834
994,432
kWh
|
$31,859
-
kW-mo/yr
|
$14,809
-
MMBtu
|
$1,314
-
gal
|
$62,830
-
lb
|
||
TOTAL IMPLEMENTED | $102,241 | $12,504 |
$10,067
373,095
kWh
|
$9,886
-
kW-mo/yr
|
$18,144
-
MMBtu
|
$1,314
-
gal
|
$62,830
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs