ITAC Assessment: AR0095
ITAC logo
ITAC Assessment: AR0095
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Fiberglass Piping
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 40,000
ft2
Annual Production 6
pieces
Production Hrs. Annual 0
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,165 12,125,440
kWh
Electricity Demand $379,036 21,550
kW-mo/yr
Natural Gas $174,861 71,791
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $137,646 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $102,241

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,069 $290 $4,752
176,143
kWh
$4,317
-
kW-mo/yr
- - -
02 2.2135: Repair and eliminate steam leaks $12,966 $140 - - $12,966
-
MMBtu
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $5,178 $1,000 - - $5,178
-
MMBtu
- -
04 2.4221: Install compressor air intakes in coolest locations $6,524 $160 $3,418
126,612
kWh
$3,106
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,185 $1,006 $1,345
49,824
kWh
$1,840
-
kW-mo/yr
- - -
06 2.7111: Reduce illumination to minimum necessary levels $11,962 $2,958 $5,954
220,692
kWh
$6,008
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $1,175 $1,008 $552
20,516
kWh
$623
-
kW-mo/yr
- - -
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $23,443 $1,390 $10,813
400,645
kWh
$15,965
-
kW-mo/yr
$(-3,335.0)
-
MMBtu
- -
09 3.7311: Maintain machines to reduce leaks $1,314 $900 - - - $1,314
-
gal
-
10 3.5315: Lease / purchase baler; sell cardboard to recycler $62,830 $8,000 - - - - $62,830
-
lb
TOTAL RECOMMENDED $137,646 $16,852 $26,834
994,432
kWh
$31,859
-
kW-mo/yr
$14,809
-
MMBtu
$1,314
-
gal
$62,830
-
lb
TOTAL IMPLEMENTED $102,241 $12,504 $10,067
373,095
kWh
$9,886
-
kW-mo/yr
$18,144
-
MMBtu
$1,314
-
gal
$62,830
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs