ITAC Assessment: GT0325
ITAC logo
ITAC Assessment: GT0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CAR FUEL & BRAKE LINES
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 100
Plant Area
n/a
Annual Production 618,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,922 1,252,931
kWh
Natural Gas $6,383 952
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,633 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,220 $100 $4,220
68,875
kWh
02 2.4221: Install compressor air intakes in coolest locations $226 $300 $226
3,810
kWh
03 2.4312: Improve lubrication practices $1,410 - $1,410
23,154
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,100 $7,200 $4,100
66,823
kWh
05 2.4133: Use most efficient type of electric motors $387 $321 $387
6,448
kWh
06 2.6232: Install set-back timers $290 $200 $290
4,689
kWh
TOTAL RECOMMENDED $10,633 $8,121 $10,633
173,799
kWh
TOTAL IMPLEMENTED $226 $300 $226
3,810
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs