ITAC Assessment: OK0443
ITAC logo
ITAC Assessment: OK0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Drill bits, anchor bolts
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 236,000
ft2
Annual Production 35,000,000
pieces
Production Hrs. Annual 7,836
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $700,684 16,497,656
kWh
Natural Gas $21,083 6,428
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,430 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,049

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,135 - $1,135
22,567
kWh
02 2.4221: Install compressor air intakes in coolest locations $1,114 $2,160 $1,114
39,859
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $800 - $800
32,239
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,381 $12,960 $8,381
165,299
kWh
TOTAL RECOMMENDED $11,430 $15,120 $11,430
259,964
kWh
TOTAL IMPLEMENTED $3,049 $2,160 $3,049
94,665
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs