ITAC Assessment: UW2210
ITAC logo
ITAC Assessment: UW2210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product manufacturing sheet metal work for buildings, airports, vehicles, etc
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $100
M
to 500
M
# of Employees 75
Plant Area 50,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 4,420
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,295 1,942,271
kWh
Electricity Demand $20,882 5,008
kW-mo/yr
Electricity Fees $13,003 -
Natural Gas $62,694 5,887
MMBtu
TOTAL YEARLY COSTS $254,874
RECOMMENDED SAVINGS* $4,255 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,255

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,861 $2,080 $1,634
20,050
kWh
$227
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,799 $2,329 $1,799
22,073
kWh
- -
03 2.7224: Reduce space conditioning during non-working hours $595 - - - $595
-
MMBtu
TOTAL RECOMMENDED $4,255 $4,409 $3,433
42,123
kWh
$227
-
kW-mo/yr
$595
-
MMBtu
TOTAL IMPLEMENTED $4,255 $4,409 $3,433
42,123
kWh
$227
-
kW-mo/yr
$595
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs