ITAC Assessment: OK0300
ITAC logo
ITAC Assessment: OK0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product TRAVEL TRAILERS
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area
n/a
Annual Production 200
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $11,368 154,455
kWh
Natural Gas $7,571 1,959
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,074 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,985 $7,500 $1,861
25,498
kWh
- $124
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,415 - $1,715
23,447
kWh
- $(-300.0)
03 2.2437: Recover waste heat from equipment $640 $980 - $640
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $34 $61 $34
586
kWh
- -
TOTAL RECOMMENDED $4,074 $8,541 $3,610
49,531
kWh
$640
-
MMBtu
$(-176.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs