Assessment Year | 2015 |
---|---|
Principal Product | beverages |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
185,000
ft2
|
Annual Production | 16,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $297,428 | 6,151,760 |
kWh
|
$0.048 |
Electricity Demand | $200,941 | 15,859 |
kW-mo/yr
|
$12.67 |
Natural Gas | $105,207 | 25,701 |
MMBtu
|
$4.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,945 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Fuel Oil #2 Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.8226: Increase efficiency of trucks | $30,426 | $29,000 | - | - | - | - |
$11,676
-
MMBtu
|
- | $18,750 | - | |
02 | 2.2628: Utilize a less expensive cooling method | $29,100 | $80,000 |
$13,682
285,041
kWh
|
$5,018
-
kW-mo/yr
|
- | - | - | - | - | $10,400 | |
03 | 3.4115: Recover and reuse cooling water | $12,134 | $497 | - | - | - | - | - |
$12,134
-
gal
|
- | - | |
04 | 2.7425: Clean or color roof to reduce solar load | $11,413 | $12,060 |
$8,372
174,410
kWh
|
$3,041
-
kW-mo/yr
|
- | - | - | - | - | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $10,141 | $2,100 | - | - | $10,141 | - | - | - | - | - | |
06 | 2.2515: Use optimum thickness insulation | $4,666 | $1,810 | - | - | - |
$4,666
-
MMBtu
|
- | - | - | - | |
07 | 2.7221: Lower temperature during the winter season and vice-versa | $4,329 | $40 |
$3,177
66,194
kWh
|
$1,152
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,877 | $2,520 | - | - | - |
$3,877
-
MMBtu
|
- | - | - | - | |
09 | 2.2511: Insulate bare equipment | $1,612 | $482 |
$1,181
24,612
kWh
|
$431
-
kW-mo/yr
|
- | - | - | - | - | - | |
10 | 2.7135: Install occupancy sensors | $1,456 | $1,782 |
$1,456
30,323
kWh
|
- | - | - | - | - | - | - | |
11 | 2.3132: Recharge batteries on during off-peak demand periods | $1,317 | $3,280 | - | - | - | - | - | - | $1,317 | - | |
12 | 2.7134: Use photocell controls | $1,139 | $480 |
$1,139
23,715
kWh
|
- | - | - | - | - | - | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $634 | $1,760 |
$634
13,200
kWh
|
- | - | - | - | - | - | - | |
TOTAL RECOMMENDED | $112,244 | $135,811 |
$29,641
617,495
kWh
|
$9,642
-
kW-mo/yr
|
$10,141 |
$8,543
-
MMBtu
|
$11,676
-
MMBtu
|
$12,134
-
gal
|
$20,067 | $10,400 | ||
TOTAL IMPLEMENTED | $49,945 | $21,749 |
$14,503
302,131
kWh
|
$4,624
-
kW-mo/yr
|
$10,141 |
$8,543
-
MMBtu
|
- |
$12,134
-
gal
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Fuel Oil #2 Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs