ITAC Assessment: GT0304
ITAC logo
ITAC Assessment: GT0304
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product HOME FURNISHINGS
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 490
Plant Area
n/a
Annual Production 10,500
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,537 3,995,897
kWh
Natural Gas $35,206 6,996
MMBtu
Fuel Oil #6 $7,506 1,756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $407 $766 $407
8,206
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,264 $6,380 $3,264
65,358
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,123 $1,510 $2,123
42,497
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,570 $1,000 $3,570
71,512
kWh
05 2.4312: Improve lubrication practices $649 - $649
12,896
kWh
06 2.7261: Install timers and/or thermostats $2,730 $4,200 $2,730
54,513
kWh
07 2.7251: Reduce air conditioning load by evaporating water from roof $10,800 $22,320 $10,800
80,891
kWh
08 2.3191: Use demand controller or load shedder $9,590 $15,000 $9,590
-
kWh
TOTAL RECOMMENDED $33,133 $51,176 $33,133
335,873
kWh
TOTAL IMPLEMENTED $18,114 $27,856 $18,114
170,574
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs