ITAC Assessment: UF0208
ITAC logo
ITAC Assessment: UF0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Polyester Monofilament Fabrics
NAICS
n/a
SIC 2221: Broadwoven Fabric Mills, Manmade Fiber and Silk
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 182,000
ft2
Annual Production 1,884
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,852 6,388,042
kWh
Electricity Demand $56,919 13,311
kW-mo/yr
Natural Gas $20,719 2,488
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,034 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,329 $6,792 $2,951
50,996
kWh
$378
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $6,021 $3,354 $6,021
103,751
kWh
- - -
03 2.7124: Make a practice of turning off lights when not needed $1,770 - $1,770
30,481
kWh
- - -
04 2.7232: Replace existing hvac unit with high efficiency model $2,597 $3,755 $1,871
32,239
kWh
$726
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,451 $2,600 $13,371
199,590
kWh
- - $(-1,920.0)
06 2.4226: Use / purchase optimum sized compressor $3,511 $15,000 $2,629
45,428
kWh
$882
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $3,269 - $3,269
48,652
kWh
- - -
08 2.2437: Recover waste heat from equipment $1,732 $2,050 - - $1,732
-
MMBtu
-
09 3.5315: Lease / purchase baler; sell cardboard to recycler $1,125 - - - - $1,125
10 4.821: Pay bills on time to avoid late fees $2,071 - - - - $2,071
11 2.8121: Apply for tax-free status for energy purchases $24,315 $50 - - - $24,315
12 4.521: Clear and rent existing space $13,843 - - - - $13,843
TOTAL RECOMMENDED $75,034 $33,601 $31,882
511,137
kWh
$1,986
-
kW-mo/yr
$1,732
-
MMBtu
$39,434
TOTAL IMPLEMENTED $54,003 $2,650 $16,640
248,242
kWh
- - $37,363
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings