| Assessment Year | 1985 |
|---|---|
| Principal Product | ELECTRONIC ORGANS |
| NAICS |
n/a
|
| SIC | 3931: Musical Instruments |
| Sales Range | $50 M to 100M |
| # of Employees | 116 |
| Plant Area |
n/a
|
| Annual Production | 28,000
pieces
|
| Production Hrs. Annual | 2,040
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $145,821 | 1,729,484 |
kWh
|
$0.084 |
| Natural Gas | $23,194 | 3,780 |
MMBtu
|
$6.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $25,064 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $23,874 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,470 | $1,000 |
$6,470
77,667
kWh
|
- | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $1,370 | $8,000 |
$(-280.0)
(-3,517)
kWh
|
$1,650
-
MMBtu
|
|
| 03 | 2.7251: Reduce air conditioning load by evaporating water from roof | $9,370 | $41,000 |
$9,370
111,372
kWh
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $294 | $2,198 |
$294
3,517
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $320 | - |
$320
3,810
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,130 | $5,500 |
$3,130
38,101
kWh
|
- | |
| 07 | 2.2212: Use minimum safe oven ventilation | $1,190 | $800 | - |
$1,190
-
MMBtu
|
|
| 08 | 2.2711: Utilize outside air instead of conditioned air for drying | $2,920 | $5,000 | - |
$2,920
-
MMBtu
|
|
| TOTAL RECOMMENDED | $25,064 | $63,498 |
$19,304
230,950
kWh
|
$5,760
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $23,874 | $62,698 |
$19,304
230,950
kWh
|
$4,570
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs