ITAC Assessment: AM0102
ITAC logo
ITAC Assessment: AM0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SOFT DRINKS
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area
n/a
Annual Production 3,309,000
pieces
Production Hrs. Annual 2,614
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,293 1,657,093
kWh
Natural Gas $25,677 4,977
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,327

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $15,000 $5,000 - $15,000
-
MMBtu
02 2.3212: Optimize plant power factor $7,969 $12,000 $7,969
-
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,400 $540 - $2,400
-
MMBtu
04 2.4239: Eliminate or reduce compressed air usage $2,000 $2,740 $2,000
46,893
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,930 $106 $1,930
44,842
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $900 - $900
12,309
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $270 $40 $270
3,810
kWh
-
08 2.6212: Turn off equipment during breaks, reduce operating time $488 $410 $488
11,430
kWh
-
09 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $370 $150 $370
5,275
kWh
-
TOTAL RECOMMENDED $31,327 $20,986 $13,927
124,559
kWh
$17,400
-
MMBtu
TOTAL IMPLEMENTED $31,327 $20,986 $13,927
124,559
kWh
$17,400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs