Assessment Year | 1984 |
---|---|
Principal Product | CARPET YARN |
NAICS |
n/a
|
SIC | 2281: Yarn Spinning Mills |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
n/a
|
Annual Production | 10,750,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $484,012 | 10,801,876 |
kWh
|
$0.045 |
Natural Gas | $274,783 | 60,267 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $131,437 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $131,437 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $3,645 | - |
$3,645
81,477
kWh
|
- | |
02 | 2.1111: Control pressure on steamer operations | $113,600 | $3,500 | - |
$113,600
-
MMBtu
|
|
03 | 2.2122: Install / repair insulation on condensate lines | $1,575 | $520 | - |
$1,575
-
MMBtu
|
|
04 | 2.5192: Modify textile dryers | $1,685 | $875 |
$590
13,189
kWh
|
$1,095
-
MMBtu
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $1,095 | $500 |
$1,095
24,326
kWh
|
- | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,405 | $600 | - |
$1,405
-
MMBtu
|
|
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,644 | $4,449 |
$5,644
126,026
kWh
|
- | |
08 | 2.4133: Use most efficient type of electric motors | $2,788 | $1,504 |
$2,788
62,134
kWh
|
- | |
TOTAL RECOMMENDED | $131,437 | $11,948 |
$13,762
307,152
kWh
|
$117,675
-
MMBtu
|
||
TOTAL IMPLEMENTED | $131,437 | $11,948 |
$13,762
307,152
kWh
|
$117,675
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs