ITAC Assessment: OR0197
ITAC logo
ITAC Assessment: OR0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Manufactured Homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 155
Plant Area
n/a
Annual Production 1,750
pieces
Production Hrs. Annual 2,750
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,350 611,958
kWh
Natural Gas $32,826 8,006
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,751 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,393

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,340 $3,000 $2,340
51,583
kWh
-
02 2.4133: Use most efficient type of electric motors $53 $201 $53
1,172
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $395 $3,200 $395
8,499
kWh
-
04 2.3212: Optimize plant power factor $410 $1,200 $410
-
kWh
-
05 2.6213: Turn off steam / hot water lines leading to space heating units $10,553 - - $10,553
-
MMBtu
TOTAL RECOMMENDED $13,751 $7,601 $3,198
61,254
kWh
$10,553
-
MMBtu
TOTAL IMPLEMENTED $2,393 $3,201 $2,393
52,755
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs