ITAC Assessment: GT0189
ITAC logo
ITAC Assessment: GT0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product VIDEO CASSETTE TAPES
NAICS
n/a
SIC 3652: Phonograph Records and Prerecorded Audio Tapes and Disks
Sales Range $10
M
to 50
M
# of Employees 290
Plant Area
n/a
Annual Production 25,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,654 13,179,660
kWh
Natural Gas $26,400 5,860
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,297 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,754

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $20,520 $57,400 $20,520
504,103
kWh
02 2.4221: Install compressor air intakes in coolest locations $1,754 $1,000 $1,754
43,083
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,560 $8,000 $4,560
111,372
kWh
04 2.3191: Use demand controller or load shedder $9,900 $9,000 $9,900
-
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,583 $1,660 $1,583
38,980
kWh
06 2.7251: Reduce air conditioning load by evaporating water from roof $10,380 $25,200 $10,380
127,784
kWh
07 2.7226: Use computer programs to optimize hvac performance $37,600 $20,000 $37,600
1,740,914
kWh
TOTAL RECOMMENDED $86,297 $122,260 $86,297
2,566,236
kWh
TOTAL IMPLEMENTED $1,754 $1,000 $1,754
43,083
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs