Assessment Year | 1983 |
---|---|
Principal Product | COMMERCIAL PRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
n/a
|
Annual Production | 3,000
ton
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,159 | 2,197,538 |
kWh
|
$0.052 |
Natural Gas | $8,420 | 1,533 |
MMBtu
|
$5.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,970 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,660 | $200 |
$1,660
31,653
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,680 | $11,600 |
$2,680
51,583
kWh
|
- | - | |
03 | 2.3191: Use demand controller or load shedder | $2,850 | $9,000 |
$2,850
-
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $330 | - |
$330
6,448
kWh
|
- | - | |
05 | 2.7251: Reduce air conditioning load by evaporating water from roof | $4,100 | $5,290 |
$4,100
42,497
kWh
|
- | - | |
06 | 2.6124: Establish equipment maintenance schedule | $580 | $360 |
$940
17,878
kWh
|
- | $(-360.0) | |
07 | 2.7261: Install timers and/or thermostats | $2,200 | $909 |
$800
32,239
kWh
|
$1,400
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $14,400 | $27,359 |
$13,360
182,298
kWh
|
$1,400
-
MMBtu
|
$(-360.0) | ||
TOTAL IMPLEMENTED | $9,970 | $22,069 |
$8,930
133,353
kWh
|
$1,400
-
MMBtu
|
$(-360.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs