ITAC Assessment: GT0157
ITAC logo
ITAC Assessment: GT0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product TREAD RUBBER
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area
n/a
Annual Production 27,770,000
lb
Production Hrs. Annual 7,664
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,072 8,887,749
kWh
Natural Gas $110,350 29,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $5,222 $3,500 - $5,222
-
MMBtu
02 2.7447: Install vinyl strip / high speed / air curtain doors $27,401 $4,800 - $27,401
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $694 - - $694
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $1,096 $500 $1,096
34,291
kWh
-
TOTAL RECOMMENDED $34,413 $8,800 $1,096
34,291
kWh
$33,317
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs