ITAC Assessment: GT0152
ITAC logo
ITAC Assessment: GT0152
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product LIFT EQUIPMENT, ETC.
NAICS
n/a
SIC 3537: Industrial Trucks, Tractors, Trailers, and Stackers
Sales Range $5
M
to 10
M
# of Employees 183
Plant Area
n/a
Annual Production 770
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,965 1,495,897
kWh
Natural Gas $29,097 6,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,750 $500 $4,750
81,770
kWh
-
02 2.7245: Use direct air supply to exhaust hoods $569 $500 - $569
-
MMBtu
03 2.7261: Install timers and/or thermostats $11,235 $2,600 - $11,235
-
MMBtu
04 2.4133: Use most efficient type of electric motors $3,300 $5,722 $3,300
56,858
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,583 $10,120 $10,583
182,298
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $287 $268 $287
4,982
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $369 $400 $369
6,448
kWh
-
TOTAL RECOMMENDED $31,093 $20,110 $19,289
332,356
kWh
$11,804
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs