ITAC Assessment: GT0120
ITAC logo
ITAC Assessment: GT0120
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product NEEDLE TRADES MACHINES
NAICS
n/a
SIC 3552: Textile Machinery
Sales Range $10
M
to 50
M
# of Employees 226
Plant Area
n/a
Annual Production 160,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,870 1,015,533
kWh
Natural Gas $22,153 5,774
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,276

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7261: Install timers and/or thermostats $7,382 $4,000 - $7,382
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,894 $975 $1,894
32,532
kWh
-
03 2.7111: Reduce illumination to minimum necessary levels $1,257 $920 $1,257
21,688
kWh
-
04 2.6232: Install set-back timers $521 $400 $521
9,086
kWh
-
TOTAL RECOMMENDED $11,054 $6,295 $3,672
63,306
kWh
$7,382
-
MMBtu
TOTAL IMPLEMENTED $9,276 $4,975 $1,894
32,532
kWh
$7,382
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs