ITAC Assessment: GT0216
ITAC logo
ITAC Assessment: GT0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product PLASTIC SHEET
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $1
M
to 5
M
# of Employees 38
Plant Area
n/a
Annual Production 9,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,101 2,524,912
kWh
Natural Gas $5,014 787
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,494

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7442: Keep doors and windows shut when not on use $2,648 $500 - $2,648
-
MMBtu
02 2.4133: Use most efficient type of electric motors $1,006 $967 $1,006
19,930
kWh
-
03 2.3191: Use demand controller or load shedder $3,352 $5,000 $3,352
-
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,561 $127 $1,561
31,067
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $840 $150 $840
16,706
kWh
-
TOTAL RECOMMENDED $9,407 $6,744 $6,759
67,703
kWh
$2,648
-
MMBtu
TOTAL IMPLEMENTED $4,494 $1,617 $1,846
36,636
kWh
$2,648
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs