| Assessment Year | 2024 |
|---|---|
| Principal Product | Machined aerospace parts |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 22 |
| Plant Area |
56,000
ft2
|
| Annual Production | 10,579
pieces
|
| Production Hrs. Annual | 3,432
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $42,507 | 531,331 |
kWh
|
$0.080 | |
| Electricity Demand | $21,392 | 2,203 |
kW-mo/yr
|
$9.71 | |
| Electricity Fees | $9,945 | - |
|
- | |
| Natural Gas | $9,614 | 837 |
MMBtu
|
$11.49 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,088 | 55 |
Tgal
|
$37.96 | |
| Water Disposal | $1,258 | 55 |
Tgal
|
$22.87 | |
| TOTAL YEARLY COSTS | $86,804 | ||||
| RECOMMENDED SAVINGS* | $20,619 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $13,502 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $3,216 | - | - | - | - | $3,216 | |
| 02 | 2.3212: Optimize plant power factor | $1,369 | $1,999 | - | - | $1,369 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,248 | $6,134 |
$4,500
56,248
kWh
|
$1,748
-
kW-mo/yr
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,075 | $1,480 |
$1,075
13,432
kWh
|
- | - | - | |
| 05 | 2.7241: Install outside air damper / economizer on hvac unit | $2,883 | $5,538 |
$2,883
36,036
kWh
|
- | - | - | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,929 | $600 |
$2,929
36,617
kWh
|
- | - | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $534 | $403 |
$456
5,694
kWh
|
$78
-
kW-mo/yr
|
- | - | |
| 08 | 2.4239: Eliminate or reduce compressed air usage | $575 | - |
$575
7,183
kWh
|
- | - | - | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,790 | $3,368 |
$1,790
22,374
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $20,619 | $19,522 |
$14,208
177,584
kWh
|
$1,826
-
kW-mo/yr
|
$1,369 | $3,216 | ||
| TOTAL IMPLEMENTED | $13,502 | $7,137 |
$8,460
105,742
kWh
|
$1,826
-
kW-mo/yr
|
- | $3,216 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs