ITAC Assessment: OK1122
ITAC logo
ITAC Assessment: OK1122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Machined aerospace parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 22
Plant Area 56,000
ft2
Annual Production 10,579
pieces
Production Hrs. Annual 3,432
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,507 531,331
kWh
Electricity Demand $21,392 2,203
kW-mo/yr
Electricity Fees $9,945 -
Natural Gas $9,614 837
MMBtu
Waste Disposal Costs
Water Usage $2,088 55
Tgal
Water Disposal $1,258 55
Tgal
TOTAL YEARLY COSTS $86,804
RECOMMENDED SAVINGS* $20,619 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $3,216 - - - - $3,216
02 2.3212: Optimize plant power factor $1,369 $1,999 - - $1,369 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,248 $6,134 $4,500
56,248
kWh
$1,748
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,075 $1,480 $1,075
13,432
kWh
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $2,883 $5,538 $2,883
36,036
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,929 $600 $2,929
36,617
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $534 $403 $456
5,694
kWh
$78
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $575 - $575
7,183
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,790 $3,368 $1,790
22,374
kWh
- - -
TOTAL RECOMMENDED $20,619 $19,522 $14,208
177,584
kWh
$1,826
-
kW-mo/yr
$1,369 $3,216
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs