ITAC Assessment: DS0099
ITAC logo
ITAC Assessment: DS0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Food Processing Equipment
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area 120,000
ft2
Annual Production 16
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,230 2,256,741
kWh
Electricity Demand $41,557 5,508
kW-mo/yr
Electricity Fees $2,402 -
Natural Gas $21,361 3,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $389 $750 $253
7,913
kWh
$136
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,032 $135 $670
21,102
kWh
$362
-
kW-mo/yr
- - -
03 2.6232: Install set-back timers $7,453 $4,500 $3,460
108,148
kWh
- $3,993
-
MMBtu
- -
04 3.4116: Meter recycled water (to reduce sewer charges) $1,231 $700 - - - $1,231
-
Tgal
-
05 4.211: Consider use / purchase of bulk materials where possible $5,810 $3,267 - - - - $5,810
06 4.211: Consider use / purchase of bulk materials where possible $3,585 $6,840 - - - - $3,585
TOTAL RECOMMENDED $19,500 $16,192 $4,383
137,163
kWh
$498
-
kW-mo/yr
$3,993
-
MMBtu
$1,231
-
Tgal
$9,395
TOTAL IMPLEMENTED $15,526 $8,602 $4,130
129,250
kWh
$362
-
kW-mo/yr
$3,993
-
MMBtu
$1,231
-
Tgal
$5,810
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs