Assessment Year | 2019 |
---|---|
Principal Product | Shrink wrapping machines |
NAICS | 333993: Packaging Machinery Manufacturing |
SIC | 3565: Packaging Machinery |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
100,000
ft2
|
Annual Production | 150
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $100,448 | 1,167,120 |
kWh
|
$0.086 | |
Electricity Demand | $12,260 | 3,724 |
kW-mo/yr
|
$3.29 | |
Natural Gas | $4,979 | 570 |
MMBtu
|
$8.74 | |
Waste Disposal Costs | |||||
Water Usage | $1,934 | 348,594 |
Tgal
|
$0.006 | |
TOTAL YEARLY COSTS | $119,621 | ||||
RECOMMENDED SAVINGS* | $86,057 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $11,909 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,929 | $250 |
$1,771
20,598
kWh
|
$158
-
kW-mo/yr
|
- | - | |
02 | 2.6127: Maintain air filters by cleaning or replacement | $241 | $105 |
$241
2,808
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,572 | $29,988 |
$13,868
161,258
kWh
|
$1,224
-
kW-mo/yr
|
- | $1,480 | |
04 | 2.7135: Install occupancy sensors | $2,084 | $1,860 |
$2,084
24,239
kWh
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $262 | $1,040 |
$227
2,635
kWh
|
$35
-
kW-mo/yr
|
- | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $7,655 | $180 |
$5,388
62,652
kWh
|
$2,267
-
kW-mo/yr
|
- | - | |
07 | 4.132: Purchase new equipment to reduce material use / cost | $31,952 | $68,000 |
$(-9,605.0)
(-111,690)
kWh
|
$(-592.0)
-
kW-mo/yr
|
$42,149 | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $331 | $180 |
$305
3,547
kWh
|
$26
-
kW-mo/yr
|
- | - | |
09 | 2.2622: Replace existing chiller with high efficiency model | $25,031 | $126,000 |
$23,784
276,553
kWh
|
$1,247
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $86,057 | $227,603 |
$38,063
442,600
kWh
|
$4,365
-
kW-mo/yr
|
$42,149 | $1,480 | ||
TOTAL IMPLEMENTED | $11,909 | $2,395 |
$9,484
110,297
kWh
|
$2,425
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs