ITAC Assessment: MZ0272
ITAC logo
ITAC Assessment: MZ0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Shrink wrapping machines
NAICS 333993: Packaging Machinery Manufacturing
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,448 1,167,120
kWh
Electricity Demand $12,260 3,724
kW-mo/yr
Natural Gas $4,979 570
MMBtu
Waste Disposal Costs
Water Usage $1,934 348,594
Tgal
TOTAL YEARLY COSTS $119,621
RECOMMENDED SAVINGS* $86,057 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,909

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,929 $250 $1,771
20,598
kWh
$158
-
kW-mo/yr
- -
02 2.6127: Maintain air filters by cleaning or replacement $241 $105 $241
2,808
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $16,572 $29,988 $13,868
161,258
kWh
$1,224
-
kW-mo/yr
- $1,480
04 2.7135: Install occupancy sensors $2,084 $1,860 $2,084
24,239
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $262 $1,040 $227
2,635
kWh
$35
-
kW-mo/yr
- -
06 2.7221: Lower temperature during the winter season and vice-versa $7,655 $180 $5,388
62,652
kWh
$2,267
-
kW-mo/yr
- -
07 4.132: Purchase new equipment to reduce material use / cost $31,952 $68,000 $(-9,605.0)
(-111,690)
kWh
$(-592.0)
-
kW-mo/yr
$42,149 -
08 2.4231: Reduce the pressure of compressed air to the minimum required $331 $180 $305
3,547
kWh
$26
-
kW-mo/yr
- -
09 2.2622: Replace existing chiller with high efficiency model $25,031 $126,000 $23,784
276,553
kWh
$1,247
-
kW-mo/yr
- -
TOTAL RECOMMENDED $86,057 $227,603 $38,063
442,600
kWh
$4,365
-
kW-mo/yr
$42,149 $1,480
TOTAL IMPLEMENTED $11,909 $2,395 $9,484
110,297
kWh
$2,425
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs