Assessment Year | 1996 |
---|---|
Principal Product | Silos and Silo Unloaders |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
93,843
ft2
|
Annual Production | 850
lb
|
Production Hrs. Annual | 4,355
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $23,356 | 473,036 |
kWh
|
$0.049 |
Electricity Demand | $16,695 | 2,783 |
kW-mo/yr
|
$6.00 |
Electricity Fees | $261 | - |
|
- |
LPG | $24,684 | 5,301 |
MMBtu
|
$4.66 |
Fuel Oil #2 | $20,696 | 4,158 |
MMBtu
|
$4.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,481 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,580 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $286 | $3,907 |
$142
2,931
kWh
|
$144
-
kW-mo/yr
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $700 | $1,252 |
$390
7,913
kWh
|
$310
-
kW-mo/yr
|
- | - | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,131 | $800 | - | - |
$1,131
-
MMBtu
|
- | - | |
04 | 2.2441: Preheat boiler makeup water with waste process heat | $190 | $603 | - | - | - |
$190
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $228 | $137 | - | - | - |
$228
-
MMBtu
|
- | |
06 | 2.2136: Install / repair insulation on steam lines | $169 | $379 | - | - | - |
$169
-
MMBtu
|
- | |
07 | 3.5311: Recover and reuse waste material | $901 | - | - | - | - | - |
$901
-
lb
|
|
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,564 | - | - | - | - |
$1,564
-
MMBtu
|
- | |
09 | 2.4221: Install compressor air intakes in coolest locations | $312 | $150 |
$312
6,448
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $5,481 | $7,228 |
$844
17,292
kWh
|
$454
-
kW-mo/yr
|
$1,131
-
MMBtu
|
$2,151
-
MMBtu
|
$901
-
lb
|
||
TOTAL IMPLEMENTED | $4,580 | $7,228 |
$844
17,292
kWh
|
$454
-
kW-mo/yr
|
$1,131
-
MMBtu
|
$2,151
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs