ITAC Assessment: DS0068
ITAC logo
ITAC Assessment: DS0068
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Silos and Silo Unloaders
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 93,843
ft2
Annual Production 850
lb
Production Hrs. Annual 4,355
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,356 473,036
kWh
Electricity Demand $16,695 2,783
kW-mo/yr
Electricity Fees $261 -
LPG $24,684 5,301
MMBtu
Fuel Oil #2 $20,696 4,158
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,481 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,580

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $286 $3,907 $142
2,931
kWh
$144
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $700 $1,252 $390
7,913
kWh
$310
-
kW-mo/yr
- - -
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,131 $800 - - $1,131
-
MMBtu
- -
04 2.2441: Preheat boiler makeup water with waste process heat $190 $603 - - - $190
-
MMBtu
-
05 2.2511: Insulate bare equipment $228 $137 - - - $228
-
MMBtu
-
06 2.2136: Install / repair insulation on steam lines $169 $379 - - - $169
-
MMBtu
-
07 3.5311: Recover and reuse waste material $901 - - - - - $901
-
lb
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,564 - - - - $1,564
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $312 $150 $312
6,448
kWh
- - - -
TOTAL RECOMMENDED $5,481 $7,228 $844
17,292
kWh
$454
-
kW-mo/yr
$1,131
-
MMBtu
$2,151
-
MMBtu
$901
-
lb
TOTAL IMPLEMENTED $4,580 $7,228 $844
17,292
kWh
$454
-
kW-mo/yr
$1,131
-
MMBtu
$2,151
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs