ITAC Assessment: DS0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Tree Delimbers
NAICS
n/a
SIC 3553: Woodworking Machinery
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 33,488
ft2
Annual Production 42
units
Production Hrs. Annual 3,250
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,665 378,370
kWh
Natural Gas $3,255 2,432
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $114,613 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $108,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,832 $4,110 $1,832
21,981
kWh
- -
02 2.4133: Use most efficient type of electric motors $340 $943 $340
3,517
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $471 $276 $471
2,345
kWh
- -
04 2.4321: Upgrade obsolete equipment $3,634 $6,400 $3,634
26,084
kWh
- -
05 2.7261: Install timers and/or thermostats $2,825 $1,350 - $2,825
-
MMBtu
-
06 2.7492: Use proper thickness of insulation on building envelope $5,032 $3,336 - $5,032
-
MMBtu
-
07 4.321: Optimize production lot sizes and inventories $98,404 $36,882 $3,377
39,273
kWh
$3,255
-
MMBtu
$91,772
08 2.7314: Reduce ventilation air $2,075 $150 $1,016
11,723
kWh
$1,059
-
MMBtu
-
TOTAL RECOMMENDED $114,613 $53,447 $10,670
104,923
kWh
$12,171
-
MMBtu
$91,772
TOTAL IMPLEMENTED $108,676 $42,661 $4,733
54,513
kWh
$12,171
-
MMBtu
$91,772
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs