Assessment Year | 1995 |
---|---|
Principal Product | Tree Delimbers |
NAICS |
n/a
|
SIC | 3553: Woodworking Machinery |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
33,488
ft2
|
Annual Production | 42
units
|
Production Hrs. Annual | 3,250
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,665 | 378,370 |
kWh
|
$0.11 |
Natural Gas | $3,255 | 2,432 |
MMBtu
|
$1.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $114,613 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $108,676 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,832 | $4,110 |
$1,832
21,981
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $340 | $943 |
$340
3,517
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $471 | $276 |
$471
2,345
kWh
|
- | - | |
04 | 2.4321: Upgrade obsolete equipment | $3,634 | $6,400 |
$3,634
26,084
kWh
|
- | - | |
05 | 2.7261: Install timers and/or thermostats | $2,825 | $1,350 | - |
$2,825
-
MMBtu
|
- | |
06 | 2.7492: Use proper thickness of insulation on building envelope | $5,032 | $3,336 | - |
$5,032
-
MMBtu
|
- | |
07 | 4.321: Optimize production lot sizes and inventories | $98,404 | $36,882 |
$3,377
39,273
kWh
|
$3,255
-
MMBtu
|
$91,772 | |
08 | 2.7314: Reduce ventilation air | $2,075 | $150 |
$1,016
11,723
kWh
|
$1,059
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $114,613 | $53,447 |
$10,670
104,923
kWh
|
$12,171
-
MMBtu
|
$91,772 | ||
TOTAL IMPLEMENTED | $108,676 | $42,661 |
$4,733
54,513
kWh
|
$12,171
-
MMBtu
|
$91,772 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs