Assessment Year | 1997 |
---|---|
Principal Product | Rubber automotive hoses |
NAICS |
n/a
|
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 420 |
Plant Area |
110,000
ft2
|
Annual Production | 14,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $337,409 | 8,016,120 |
kWh
|
$0.042 |
Electricity Demand | $66,402 | 14,542 |
kW-mo/yr
|
$4.57 |
Electricity Fees | $20,831 | - |
|
- |
Fuel Oil #6 | $596,666 | 146,976 |
MMBtu
|
$4.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $272,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $255,750 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.445: Install equipment to move product | $104,110 | $129,700 |
$(-780.0)
(-19,930)
kWh
|
$(-110.0)
-
kW-mo/yr
|
- | - | $105,000 | - | |
02 | 3.1192: Reduce scrap production | $100,760 | $25,700 | - | - | - |
$3,260
-
lb
|
- | $97,500 | |
03 | 2.1232: Keep boiler tubes clean | $39,970 | $70,960 | - | - |
$39,970
-
MMBtu
|
- | - | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $10,910 | $1,330 |
$9,830
252,052
kWh
|
$1,080
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2441: Preheat boiler makeup water with waste process heat | $10,880 | $25,180 | - | - |
$10,880
-
MMBtu
|
- | - | - | |
06 | 3.5218: Reuse / recycle/ sell rubber products | $5,430 | $14,800 |
$(-730.0)
(-18,757)
kWh
|
- | - |
$46,160
-
lb
|
$(-40,000.0) | - | |
TOTAL RECOMMENDED | $272,060 | $267,670 |
$8,320
213,365
kWh
|
$970
-
kW-mo/yr
|
$50,850
-
MMBtu
|
$49,420
-
lb
|
$65,000 | $97,500 | ||
TOTAL IMPLEMENTED | $255,750 | $227,690 |
$9,050
232,122
kWh
|
$970
-
kW-mo/yr
|
$39,970
-
MMBtu
|
$3,260
-
lb
|
$105,000 | $97,500 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs